After some initial success, we hit a HUGE snag getting the old floor up. In particular the rails on the floor that the bus seats secure down to. Had to cut probably 100+ bolts with a saws all.
But that’s done and it’s easy street now.
Last week got the door mounted and put a functioning door knob with a lock on it.
Got the first layer of insulation over most of it this weekend, cut and glued. And was able to get the floor treated for rust, a coat of enamel paint, insulated, and now the subfloor glued down.
Next steps are to install the RV windows, insulate the ceiling, attach my framing, & install the exterior cameras. Then I’ll be able to get it the paint shop and then hit the home stretch.
Been quite the endeavor, but still moving forward.